Monday, 1 September 2014

A Report on Technical Visit to Water treatment plant at TK Halli, BWSSB



For our students to get an understanding of the functioning of the water treatment plant and appreciate the practical aspects of it. A visit to the BWSSB Water treatment plant at TK Halli, Kanakapura district was undertaken on Saturday 19th July, 2014. 


In total 37 students (26 from VII Sem BTech and 11 from III Sem MTech) accompanied by 5 faculty members visited the plant.

An engineer from the BWSSB explained and demonstrated the process of water treatment.

1 comment:

Report on PCB Design and Fabrication Workshop 2022

The Department of Physics and Electronics had organized a Workshop on PCB Design and Fabrication for the BSc Electronics students (PME and C...